The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3

The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3 Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of…

Ostaja
Fingrid Oyj
Julkaistu
2026-06-30
Arvo
40 795 669 EUR
Ilmoitus
52670

Voittajat ja hankinnan osat

The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 3

Fingrid Oyj has decided to build new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission lines will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085)…

Tarkista HILMAsta Muut ostajan hankinnat Hae kaikista hankinnoista