The construction of 400 kV transmissionline Herva - Nuojuankangas

The construction of 400 kV transmissionline Herva - Nuojuankangas Fingrid Oyj is requesting Tenders for the construction of two new parallel 400 kV transmission line with 110 kV circuits between Jylkkä and new Kukonkylä substation along with necessary modifications to the existing network. The lines are designed for their own, parallel-placed supports. The length of line route is app. 40 km,

Ostaja
Fingrid Oyj
Julkaistu
2025-12-21
Arvo
26 000 000 EUR
Ilmoitus
36860

Voittajat ja hankinnan osat

The construction of 400 kV transmissionline Herva - Nuojuankangas

Fingrid Oyj is requesting Tenders for the construction of two new parallel 400 kV transmission line with 110 kV circuits between Jylkkä and new Kukonkylä substation along with necessary modifications to the existing network. The lines are designed for their own, parallel-placed supports. The length of line route is app. 40 km

Tarkista HILMAsta Muut ostajan hankinnat Hae kaikista hankinnoista